Dear all,
My problem is simple (to explain, and I guess to solve but I can't find out how...). I found it in a complex model, I extracted the data to a very simple one (1 reservoir, 1 pipe, 1 junction) and it remains the same. Conditions are as follow, data rounded for example:
- Junction demand : 31,000 m3/d
- Pattern average : 1
- Pattern points : 24
- Simulation duration 24h.
- Totalizing Flowmeter result : 30,000 m3/d
Could anyone explain where is my problem, why does the totalizing flowmeter volume doesn't match my total demand?
Please let me know if you need more input from me, I will answer asap.
Waiting for your answers, thanks a lot.
David