i used conduit to join catch basin with the manhole but due to the short length of the conduit the program keep giving me error messages (20283 "Base" "Conduit" "415" "lk-1" (N/A) "Slope (2.806 ft/ft, V:H) is greater than (1.000 ft/ft, V:H). Check to see if the Start and Stop Inverts are correct." Hydraulics Validation )is there a way to overcome this problem ??
Look into the default design constrain and change the slope to higher value to eliminate this message if the slope is accepted. This only notification to be more familiar how is your model.