While designing for a 24 x 7 system for a city with the existing water infrastructure like transmission mains, feeder mains, balancing reservoirs, it is better to use the EPS method. To ensure the continuous supply to the tanks, flow stored must not be negative in the calculation summary. In other words the tank must not be empty at any time under EPS for 24 x 7 supply to consumers. Am I right in my principle? or if I get negative sign in flow stored what is the inference? How to rectify the same?
Mark
Answer Verified By: Sushma Choure