Hi
I am going to connect a proposed sanitary network to Existing network.
In the connection manhole point, invert elevation should be 79.80.
Is there any method to SewerGems design network from downstream (connected point) to upstream?
Because when design is done based on upstream to downstream, software consider to min cover and min/max slope, but it this case, I don't care to min cover in the first upstream manhole!
Thanks
Hamid Akbari
Regards,
Jesse DringoliTechnical Support Manager, OpenFlowsBentley Communities Site AdministratorBentley Systems, Inc.
Answer Verified By: Sushma Choure