I am trying to tweak some demands in my water model based on some suggestions that Darwin Calibrator is suggesting. I noticed that Darwin Calibrator is indicating a different original demand than the demand control center tells me and I'm confused as to where the value came from.
The active scenario is the same as the one that Darwin is using.
Any ideas?
Mark
tschrage,
What you need to do is click on where it you have "New Calibration Study - 1". From there you should be able to click on 'Field Data Snapshots' tab and check on the right side of the screen to see what the 'demand multiplier' (in the red box to the right) is set to. If it's anything other than 1 that is probably why your Original demands in the solution show as less than the value of your demands in the demand control center. If I had to guess I'd say your demand adjustment is set to about 0.72. Please see the screen shot below for where you should be looking.
Please let me know if that helps. If it doesn't please use one of the methods below to share your files. If you would like the files to be visible to other members, compress the files into a zip file and upload them as an attachment using the ‘Advanced Reply editor’ before posting. If your data is confidential, you can follow the instructions in the link below to send it to us via Bentley Sharefile. Files uploaded to Sharefile can only be viewed by Bentley.
Here a screenshot of my demand multiplier being set to 1. I will upload a copy of my model for someone to take a look at.
Can you let me know if the name of the file that you uploaded was the same as what is listed in your screen shot above, "2015 Water Model"? If it is then I don't see it in the folder where it should be. If you can upload the model files again I will download them and have a look. Regards, Mark