Bentley Rail Track Point control

Hi,

I'm currently modelling some earthworks for proposed railways. I'm having some slight difficulty when it comes to using the Point Control tool. When producing the corridors, i specified the drop interval as 1m. Once this corridor has been produced, the intervals are perfect. However when point controlling, it seems to drop more templates into the corridor e.g. 5 templates per meter.

It may be a simple reason as to why it is doing this, but i do not have good enough knowledge on this software.

Please could someone explain why this is happening.

Kind regards,

 

Hashim Syed