At 9:29 UTC on September 4th Azure experienced a localized spike in temperature. Automated data center procedures to ensure data and hardware integrity went into effect when temperatures hit a specified threshold. Engineers are actively working to restore services.
All ProjectWise Integration Servers should be functioning.
Most systems have cleared alerts.
A severe weather event, including lightning strikes, occurred near one of the South Central US datacenters. This resulted in a power voltage increase that impacted cooling systems. Automated datacenter procedures to ensure data and hardware integrity went into effect and critical hardware entered a structured power down process.
Bentley is seeing several systems coming back online.
Azure has restored power to some of the cooling devices and is seeing systems starting to recover.
Some Azure Active Directory federated users may be impacted. Azure engineers are also working this issue.