I am trying to get everything straight on the new Revision process. I have a project that is a strung project with 3 FPID numbers and multiple components per FPID.
I have been referring to the following: PPM1: Ch 20, PPM2: Ch 3, and the CADD Manual Section 5.12
So when I do a Revision, I need to list all revisions on the Lead Project Keysheet, which is pretty clear. What if I am running out of space to list all the Revisions? Do I just remove the oldest revision in order to show the newest?
Do I also show the revisions to each particular component on that respective keysheet? I believe this is how we usually do it.
Then to go along with that, since I have updated those keysheets, I would also need to create a new Signature sheet and show the EOR signing the keysheet and signature sheet, correct? The revisions being done on this part are for Lighting and Signals only, so there is no Roadway revisions except for the Lead Keysheet.
If there is a revision to the Lighting component on the non-Lead project, do I still need to list that revision on the non-Lead Roadway Keysheet?
I think that is all the questions that I have.
Thanks
Thank you both for the helpful hints. I think I might have one more revision before I run out of space, so hopefully that is as far as it goes.
Zachary Billings, P.E.
Senior Roadway Engineer (Licensed in FL and MI)
CONSOR Engineers, LLC
System Info:
Windows 11 | Intel Core i7-13700k | Nvidia RTX 3080 FTW3 Ultra | 32 GB of RAM | 2 TB Western Digital Black SN850x NVME
ORD Version 10.12.02.004 | FDOT Connect Version 10.12.01.00
YouTube Page for ORD: https://tinyurl.com/BillingsCADD