Drainage Structures Cross Section pipes

While running FDOTSS2  Drainage Structures Cross Section the AH & BK pipes are drawn lower than the pipes Invert data and lower than the bottom of structure. When running the same data with FDOT2010 the pipes are drawn correctly. What will cause the pipes to be drawn incorrect in FDOT SS2?

Power Geopak V8i-Version 08.11.07.615

FDOT2010.04.00

FDOTSS2 Version: 01.01.00