<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="https://communities.bentley.com/cfs-file/__key/system/syndication/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Converting workspace from V8i/SS10 to CONNECTS/ORD</title><link>https://communities.bentley.com/communities/user_communities/texas-dot-consultants/f/projectwise/237546/converting-workspace-from-v8i-ss10-to-connects-ord</link><description>I am working on a project that was created in SS10/V8i and currently at the 60 percent stage. Can I convert it to the CONNECTS/ORD workspace?</description><dc:language>en-US</dc:language><generator>Telligent Community 12</generator><item><title>RE: Converting workspace from V8i/SS10 to CONNECTS/ORD</title><link>https://communities.bentley.com/thread/740378?ContentTypeID=1</link><pubDate>Fri, 04 Nov 2022 20:42:56 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:6cca21be-1e80-4112-a4be-7538ad0c3939</guid><dc:creator>Taylor Mansfield</dc:creator><description>&lt;p&gt;Bulbul,&amp;nbsp;&lt;/p&gt;
&lt;p&gt;The ProjectWise Work Area can be retrofitted to enable it&amp;nbsp;for ORD but your files that were started in SS10 will require a manual process to upgrade to the ORD schema, unless they&amp;#39;ll just be reference files and you&amp;#39;ll create brand new design files in ORD.&amp;nbsp; I recommend closing the project out in SS10 since it&amp;#39;s already at 60%, but it is possible to upgrade them.&amp;nbsp; The Divisions can assist with retrofitting the Work Area to enable ORD but can&amp;#39;t provide assistance on upgrading the SS10 files.&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Converting workspace from V8i/SS10 to CONNECTS/ORD</title><link>https://communities.bentley.com/thread/739870?ContentTypeID=1</link><pubDate>Wed, 02 Nov 2022 12:34:42 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:24f6a1a6-4e10-4e5a-9081-e73b4042fd8e</guid><dc:creator>Bulbul Ganguly</dc:creator><description>&lt;p&gt;I have the model created and all the sheets have been created as well. I guess that means I stay with Geopak? The project is letting in 2027, so we have time between now and then and if I convert it now, I can take advantage of the new tools as projects go through numerous changes till it is finally lett.&amp;nbsp;&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Converting workspace from V8i/SS10 to CONNECTS/ORD</title><link>https://communities.bentley.com/thread/739782?ContentTypeID=1</link><pubDate>Wed, 02 Nov 2022 04:25:34 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:59f24c7b-ae65-420f-b073-ab586040a966</guid><dc:creator>Steve Phipps-C</dc:creator><description>&lt;p&gt;TxDOT recommends&amp;nbsp; that projects beyond the Alignment stage remain in Geopak.&amp;nbsp; However, if all you have created is an alignment then you can covert to ORD.&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item></channel></rss>