<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="https://communities.bentley.com/cfs-file/__key/system/syndication/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/"><channel><title>Thomas Fletcher's Activities</title><link>https://communities.bentley.com/members/05ca2695_2d00_fe90_2d00_4811_2d00_9ce0_2d00_a2e8586e3ff6</link><description>Thomas Fletcher's recent activity</description><dc:language>en-US</dc:language><generator>Telligent Community 12</generator><item><title>Leap Bridge Concrete V18 Update 1 - Leap Conspan - Fatigue I (Final 3) Stress Check</title><link>https://communities.bentley.com/products/bridge_design___engineering/f/bridgemaster-lars-leap-openbridge-rm-forum/167121/leap-bridge-concrete-v18-update-1---leap-conspan---fatigue-i-final-3-stress-check</link><pubDate>Mon, 27 Aug 2018 14:34:58 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:894430a0-865f-45e3-8508-418c9b22395f</guid><dc:creator>Thomas Fletcher</dc:creator><description>&lt;p&gt;When running superstructure program (V18 - update 1) for Prestressed Girder design and reviewing Design Summary, the Fatigue I (Final 3) stress check has no stress values (i.e all &amp;quot;zeros&amp;quot;)&lt;/p&gt;
&lt;p&gt;Same file running V18 shows stress values in Fatigue I (Final 3) stress check.&lt;/p&gt;
&lt;p&gt;How is this resolved?&lt;/p&gt;
&lt;p&gt;Thanks&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>Ask A Question I</title><link>https://communities.bentley.com/achievements/460ac7df-7ccc-4c42-a204-9e05eef3be09</link><pubDate>Mon, 27 Aug 2018 00:54:40 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:43578617-c036-44a1-b921-fd3a39720c03</guid><dc:creator /><description>Ask a question in a forum.</description></item><item><title>LEAP Bridge Concrete - Substructure (RC Pier) - AASHTO 5.7.3.4 Crack Control Spacing</title><link>https://communities.bentley.com/products/bridge_design___engineering/f/bridgemaster-lars-leap-openbridge-rm-forum/133639/leap-bridge-concrete---substructure-rc-pier---aashto-5-7-3-4-crack-control-spacing</link><pubDate>Mon, 03 Apr 2017 12:44:25 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:fdf0d290-05d0-441b-a557-f7fed948d527</guid><dc:creator>Thomas Fletcher</dc:creator><description>&lt;p&gt;We are designing a Multi-Column Pier using LEAP Bridge Concrete Connect Version 16.02.00.01 and LRFD 7 with 2016 Interims.&lt;/p&gt;
&lt;p&gt;The &amp;quot;Cap&amp;quot; design output for &amp;quot;Cracking&amp;quot; (AASHTO 5.7.3.4) shows a code violation when checking top and bottom bar spacing at a given point.&lt;/p&gt;
&lt;p&gt;For instance, at a given point, the &amp;quot;Top&amp;quot; bar cracking check will give expected results but the &amp;quot;Bottom&amp;quot; bar cracking check will show a Load Combination of &amp;quot;0&amp;quot; along with a Cracking Stress &amp;quot;fs&amp;quot; of &amp;quot;0&amp;quot;. This results in the program checking the actual bar spacing against the absolute minimum spacing of 5&amp;quot;.&lt;/p&gt;
&lt;p&gt;If the &amp;quot;Cracking Stress&amp;quot;, either top or bottom, shows a value of &amp;quot;0&amp;quot;, then the program defaults to the minimum 5&amp;quot; spacing and shows a code violation. &amp;nbsp;It would seem if there were &amp;quot;Zero&amp;quot; cracking stress, then the required spacing would be a &amp;quot;large&amp;quot; value.&lt;/p&gt;
&lt;p&gt;The previous versions of RC Pier would show a &amp;quot;Zero Cracking Stress&amp;quot; but would result in a large required bar spacing value.&lt;/p&gt;
&lt;p&gt;Is this a &amp;quot;program error&amp;quot; or am I inputting something wrong?&lt;/p&gt;
&lt;p&gt;Thanks&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item></channel></rss>