BIM Solution - Solar Cell factory

DHV was asked to design a photovoltaic cells factory in Ponferrada, Spain.

The factory is planned to have a total output capacity of 100 MW per annum. DHV is responsible for the complete factory design, including architecture, construction challenging, building and process related installations.

The engineering department is in charge of the hook-up and construction supervision. Improving communication and reducing costs in the detailed engineering phase are the mains reason for DHV to choose for 3D software solutions.

Related