• To create a Saved View from New or Existing Callouts within a Sheet Model

    Imagine a scenario where you are working on the front view of a 3D model for a house. You are required to produce a top-view of the foundation for this 3D model. Using the Detailing Symbols tools a callout can be placed along the line of the foundation in the front view that generates the desired dynamic view. The position of the callout can be modified to dynamically change the position of this view.  Once this dynamic…