MX Drainage – Multiple Pipes

One of the less known features of MX Drainage is the ability to add up to 3 pipes between notes. This update was added to MX Drainage in MX version 08.11.07.227. A run through of the process is detailed below.

Create a pipe run as standard as shown below.

 

Select the pipe run by clicking on it; it should be highlighted as below. (Ensure that the application focus is set to MX)

 

Right Click on the pipe to get the pop-up to appear, Select Properties from the list of options.

 

The panel below will appear detailing the properties of the pipe.

 

You can set the pipe diameter and the number of pipes as shown below.

 

Select apply and the pipe will update in the drainage design. You will now have 2 pipes of fixed pipe size running between the two nodes.

Any questions, please add comments to this post, or drop me a mail at jason.walsh@bentley.com or call us on 0808 1019246.

Parents
  • Hi Jason,

    one of our client having don't know how to start the drainage design in MX, they went to the drainage design training conducted by my ex-collegue but still they are unable to start design, perhaps if you have some avi's on how to start the drainage design, it'll be very good. they are having MXRoad V8i version till V8i SS2, total 7 license and under active select.

    please advice, thanks.

    kuga-astasoft

Comment
  • Hi Jason,

    one of our client having don't know how to start the drainage design in MX, they went to the drainage design training conducted by my ex-collegue but still they are unable to start design, perhaps if you have some avi's on how to start the drainage design, it'll be very good. they are having MXRoad V8i version till V8i SS2, total 7 license and under active select.

    please advice, thanks.

    kuga-astasoft

Children
No Data