I am running a Production that has 127 tiles and one of the tiles has failed.The aerotraingulation completed on 3524 photos with 70.8 gigapixels. The machine I am running the production on is a Azure VM withWindows Server 2016, Intel Xeon 24 cores, 224 GB RAM, 4 Nvidia M60 graphics with 8 GB/card. I have optimized the VM to use the M60card as the main GPU as well as turned up the 3D settings on the card for maximum performance. I have attached the log file of the failed tile.
I started the production 2 days ago and it is on tile 21 of 127.127Tiles-20GBRAM - Tile_+005_+009.log
127 tiles seems like a hell of a lot. I'm pretty sure that is a memory restriction though. Are you actually getting your 224 GB RAM? Can you run a lower GB benchmark against the aerotriangulation time? How has the project turn out?