Product(s): | APM Implementation and Performance Management | ||
Version(s): | 7 | ||
Environment: | N/A | ||
Area: | N/A | ||
Subarea: | N/A |
An APM user has found that the several properties of the checksheet can be changed after the checksheet is completed and processed. This is not logical, when a checksheet is processed the fields checksheet number, related asset, checksheet type, operating condition, shift, work order, etc should be locked from editing. .
This has been reported as a bug, ADO 1294483.