I am currently writing the processes for mobile working with the aim to use Bentley’s new MapCapture software. We have been using maintenance manager for 10 years as a text system without using the mapping interface. We no longer use Structures Manager, UKPMS or Schemas Manager.
Our inspectors will be given a zone to inspect containing a list of streets. Ideally I would like a level 3 style structure for the inspectors same as the street works system. The defect may be linked to the actual section but does not need to be seen by the inspector or the insurance reports.
Currently – inspections against sections of a street
The below green street would be split into 6 sections all due for inspection.
Advantages
Disadvantages
Any missed sections would be easily identified.
Issuing one zone of 80 streets would become a zone of 400 section based on 5 sections per street. This becomes a much larger administration task and confusing for all involved.
When producing S58 defence due to not having a no defects found for the entire street one would be needed for each section.
Building a program of inspections becomes much more difficult due to the increase in sections.
Aim - Inspections against a level 3 street
Much like the street works side the works are displayed at street level not section (ESU).
Simple view for mobile device
Easy to build discoverer reports for late inspections by street
Simplifies insurance defence paperwork
Existing inspections program can continue to be used.
Answer Verified By: Paul Withington