When sending an EToN 6 Full Registration with a site declared as Interim Reinstatement, a warning is no longer shown if the user doesn’t supply a value for Construction Method. If the user does not supply this, they can then receive an FPN.
User has also reported that the same warning isn’t shown when sending an EToN 5 Full Registration for a site declared as Permanent Reinstatement and the Construction Method has not been set to ‘Not Applicable’. User has received FPNs because they haven’t declared the ‘Not Applicable’ construction method on permanent reinstatement sites when sending an EToN 5 Full Registration notice using 4.5.10 release.
Previously Notice Warning 100 was shown for both of these scenarios:
Site Construction Method should be 'Not Applicable' for Non Interim Reinstatements. Or Method B,C or D for an Interim Reinstatement.
This problem has been fixed in Exor TMA Noticing Manager fix 18 for the 4.5.10 release.