What's New in LEAP Bridge Steel CONNECT Edition V20 Update 2 (through OpenBridge Designer)?

LEAP Bridge Steel CONNECT Edition V20 Update 2 is now available through OpenBridge Designer CONNECT Edition V10.09.00.10 on Bentley Software Downloads. This update release contains enhancements and bug fixes. The enhancements are summarized below.

  • Shear stud consolidation under BIM workflow
    This enhancement allows to model shear stud in OpenBridge Modeler, then transfer it to LEAP Bridge Steel for analysis and design.
  • Field splice consolidation under BIM workflow
    This enhancement allows to model field splice in OpenBridge Modeler, then transfer it to LEAP Bridge Steel for analysis and design.
  • Pedestrian live load under BIM workflow
    This enhancement offers the capability to define and use pedestrian live load in LBS analytical under BIM workflow.
  • Improved camber report
    This enhancement offers custom points of interest, and allows to export camber diagrams to spreadsheets.

For more details, please see the attached PDF file of the release notes..

Anonymous