Bentley Systems is privileged to be a Bronze Sponsor for the Steel Conference. This years conference also includes the World Steel Bridge Symposium.
Stop by the Bentley Software Booth and learn more about our new software for the analysis and design of Steel Bridges.
NBC Nightly News segment highlights the issue of infrastructure (specifically Roads and Bridges) in the USA. Click here to watch the video.
Also visit this site from Transportation for America for detailed statistics on the state of Bridges.
Read more about this unique project by the Bloom Companies, LLC and view some very interesting pictures of the BE Inspired award winning bridge here.
Watch this short YouTube video of the project from Wisconsin DOT by clicking here.
A brief overview of how the full bridge 3D model from LEAP Bridge can be further repurposed for construction simulation using MicroStation.
First create a simple bridge model using the ABC Wizard in LEAP Bridge Enterprise (LBE). As soon as you click on finish on step 3 of ABC Wizard, the geometry tab in LBE displays the full 3D model of the bridge. Right mouse click in this view and select the option to export this model…
One of the most powerful features in LEAP Bridge is the ability to export the full 3D bridge model, including super and substructure to MicroStation dgn file format. After the model is created in LEAP Bridge, simply right mouse click on any 3D view, and select the option to Export. Chose the DGN format in the options and provide a file name. The dgn file is generated, followed by a confirmation message indicating the…
The new RM Bridge V8i v08.11 product line is the next major release of the renowned and widely used software suite RM Bridge V8i.
The software performs analysis and design of arbitrary bridge structures…
RM Bridge V8i (SELECTseries 3) is the 4th major release (July 2012, maintenance release…
General
2. Fix for ASD/LFD/LRFR live load symmetry. A larger live load value was sometimes computed. Changes have been made to the lane live load computation which will result in a slight increase or decrease of the previously computed value.
3. Fix in Echo.lis when reporting nonstandard truck axle…
If you are visiting NASCC, The Steel Conference, in St. Louis, MO, April 17-19, 2013, please stop by the Bentley booth (#919) for an exciting preview of our sophisticated new offering for Steel Bridge Design.
Bridge Inspectors have a new level of mobility with InspectTech Collector Mobile on the iPad. This app enables quick and effective collection of transportation infrastructure asset information and completion of inspections in the field. A streamlined interface delivers valid fields and drop-downs as the inspector works through a logical and thorough collection of data. Support for rich data such as photos, video, and…
In past months several enhancements have been implemented in RM Bridge V8i version. Due to the variety of new functions we decided to create a short summary of the comprehensive functionality in form of document. We are encouraging you to accept the challenge of using them and giving us feedback of your experience as well as new ideas, which will serve you during your bridge analysis and…
See also release notes RM Bridge V8i (SELECTseries 3) v08.10.12.01.
RM Bridge V8i (SELECTseries 3) is the 4th major release…
In case you've missed it, here is a link to an excellent presentation by Finley Engineering Group, Inc. (FINLEY).
http://www.roadsbridges.com/bridge-information-modeling-design-and-engineering-collaboration
Webinar Overview:
Bentley provides the world’s most comprehensive solution for Bridge Information Modeling (BrIM). At the core of this solution are MicroStation, RM Bridge, and Bentley Rebar. This overview of…
LEAP Bridge v12.01.00.57
Enhancements:
RM Bridge V8i (SELECTseries 3) v08.10.07.02 is a maintenance release for v08.10.07.01We recommend using it as your new production release. It fixes reported common problems of the main release:
See also release notes RM Bridge V8i (SELECTseries 3) v08.10.07.01.
RM Bridge V8i (SELECTseries 3) is the 4th major release (July 2012) of the renowned and widely used software suite RM Bridge V8i, succeeding RM2006 in 2009. The software performs…
LARS Bridge General Enhancements and Fixes
Watch Now!
Discover how the Louisiana Department of Transportation and Development integrated design efforts across multiple teams and locations to complete their bridge project under budget and ahead of schedule!
An exciting new addition to the Bridge Product line at Bentley rounding off the bridge asset life cycle management, all the way from design to maintenance and inspection.
Bentley Systems, Incorporated, the leading company dedicated to providing comprehensive software solutions for sustaining infrastructure, today announced at this gathering of infrastructure professionals from around the world that it has acquired InspectTech…
RM Bridge V8i (SELECTseries 2) is the 3rd major release (March 2012) of the renowned and widely used software suite RM Bridge V8i, succeeding RM2006 in 2009. The software performs analysis…
Bentley’s Bridgekey product line is now the LARS product line. Also, all of the LARS products are now utilizing the “SELECT series 2” licensing. The individual products names have also been changed. The name changes are:
LEAP Bridge v8i (SELECTseries 2) v10.00.02 is a maintenance release and incorporates the following fixes to itself and its component programs:
LEAP Bridge v10.00.02
Fixes: