We are working in a large model wich requieres about 15 minutes to run without CS and 2.5 hours with CS (internal formulas). It is a cable stayed bridge linear construction stage analysis with a total of 1003 stages.
We have reduced the CS load cases to a minimum because we have seen CS are demanding most of the calculation time.
Also we have tried to reduce the number of elements that have CS using TStop for the elements where this action can be neglected, but we are not sure if using TStop reduces calculation time in an effective manner or there is another way to avoid CS calculations in certain elements.
Is there an alternative method to avoid CS calculations in some elements?
Any other idea to reduce calculation time?
Answer Verified By: MarcosBeier