If I have more than one bridge and one of them is the active bridge, how do I make another bridge the active bridge?
Thanks, Eric, OBM ver. 08.11.09.211
When I open the Project Ribbon my two tab options are "Links" or "File" - no "Bridge Data." I see that this forum is two years old. Is there a new location/tool where I can set a bridge to active?
Answer Verified By: EricG
Thanks! I now realize my OBM was outdated. I upgraded to SS3 and found the tool per your screen shot.