Post-Tensioning of AASHTO I Girder Type LEAP Bridge Concrete

June 24, 2017

Dear Engineers,

Greetings for all structural engineers in the world.

I'm a bridge engineer from the Philippines and currently connected in a consulting firm. I'm using Leap Bridge Concrete for less than a month and find out that it's a very powerful bridge software. I'm wondering if there is a post-tensioning option for AASHTO I Girder in the latest Leap Bridge Concrete v17. Can you help me in finding a solution?


Thank you.

 

Regards,

Ave Robin Ramos