RM Bridge warning

Does anybody know what is the reason of the warning like this ?

*** WARNING: No duct reduction (b-beg, b-end) for element(s) 1001 defined (tendongroup(s) exist(s)) !

And how to updated model to avoid it ?

Regards,

Bogdan

Parents
  • Hi Bogdan,

    This warning means there are no duct reduction of the web width for the shear capacity check at the beginning and end of the listed elements. This values can be automatically calculated if the tendons are individually created, thought they need to be an additional input when created by tendon groups. So in this case user defined values are needed and it might be a good idea to update the model with a value that is not zero in the tendon group as this is the total width to be substracted to create the effective width. More information can be found at the RM Bridge Analysis User Manual at section 15.5 Shear Capacity Check

      

    Warnings are not Errors, although they need to be individually verified by the user but not necessarily eliminated in the calculation process. 

    Marcos Beier 

    Senior Technical Support Engineer

    RM Bridge is now an integral part of OpenBridge Designer CONNECT Edition as Bentley’s solution for supporting the design and engineering tasks in bridge construction for all types of bridges and construction…

Reply
  • Hi Bogdan,

    This warning means there are no duct reduction of the web width for the shear capacity check at the beginning and end of the listed elements. This values can be automatically calculated if the tendons are individually created, thought they need to be an additional input when created by tendon groups. So in this case user defined values are needed and it might be a good idea to update the model with a value that is not zero in the tendon group as this is the total width to be substracted to create the effective width. More information can be found at the RM Bridge Analysis User Manual at section 15.5 Shear Capacity Check

      

    Warnings are not Errors, although they need to be individually verified by the user but not necessarily eliminated in the calculation process. 

    Marcos Beier 

    Senior Technical Support Engineer

    RM Bridge is now an integral part of OpenBridge Designer CONNECT Edition as Bentley’s solution for supporting the design and engineering tasks in bridge construction for all types of bridges and construction…