Moment capacity with CONSPLICE

I am modeling a precast post tension girder with CONSPLICE. I do the analysis and then go to the design to check moment capacity. I get  a set of results. when I do the summary report or shear check and go back to the moment capacity, I get a different result. I wonder if anyone has experienced similar issue and any possible solution to this problem.