LEAP/RC-PIER terminated abruptly with seismic load

Has Bent with 3 Columns with Footing on Piles.

Program requires to run Column design before Cap design. After column design try to run Cap auto design, it starts and then terminate abruptly. Tried LRFD normal, 2015 interim, 2016 interim and 2018. All has same behavior.

Any suggestions?