Copying Loads into RC-Pier

I'm working on a project with several multi-column piers and am having trouble copying loads into the load data tables.  The superstructure has pretty complex geometry so most of the loads are being calculated outside the program in spreadsheets.  I've used previous versions of RC-Pier and have not had any issues copying in load tables and/or individual or multiple values in a table that is already created.  However, with the new version (I'm running 19.00.00.22) I can't copy anything into the tables, in any variation that I try.  Is there a fix for this?  I've tried using the "Import Loads" tool, and while that works, it isn't really feasible to keep using this throughout the design process, as it takes a few steps to convert loads into the correct format from excel to a csv.  Also, the scale of the project (20+ piers with 26+ bearings per pier), makes manually inputting/updating the bearing loads not feasible.

Thanks.