Cable stayed bridge modeling OBM or RM

I am modeling a conceptual design for a cable stayed bridge. I have modeled other bridges in Open Bridge Modeler however I dont think it allows for cable stayed bridges. I know RM Bridge does. Should i Just try and do everything in RM? the main goal of this task is to render our conceptual design for our proposal. 

One of our engineers has already created a roughdraft of the model in rm. I am at a crossroads as whether to try and do everything in rm or model the bridge in OBM and manually model the cables. 

any guidance on this would be great! thanks

Parents Reply Children
No Data