In Leap Bridge Concrete V20.00.00.46 Substructure module, is it possible to create a stepped pier cap on multi column pier that follows a normal crown roadway? That is with the max cap depth at the center and stepping down to each end? I am working in a standalone analysis.
Thanks
Edit: disregard, I figured it out.
Glad the issue is resolved.