We are designing a simple two span precast bridge. The pile caps will be cast in place concrete and the deck units will be precast concrete deck units (mostly 5' x 20' units) with a composite topping pour. I can not figure out how to get such a simple bridge to work in LEAP concrete, is this too simply for the program? We really need to design the rebar for the caps, deck units, and overall deck.
Leap Concrete program can design Slab bridge (Post Tensioned) ,if that is the intent.
Click on ABC wizard and select CIP Slab bridge and then model the pier with pile cap and input the material information and complete the modeling part.
In the individual module user can design the superstructure and substructure.
Answer Verified By: MarcosBeier