RC-Pier Live Load Generation

Hello,

I have a query regarding auto-generation of live loads on substructure. The pier geometry is skewed inverted T section, 196 ft. long and 21 bearings (on each side of ledge). It takes forever to generate the auto live loads on this structure and I am not able to generate the loads at all, even with just selecting "Design Truck" and no lane load, fatigue, braking forces etc. 

I can check the design with phased structure but want to know if there is a limitation for bent length/analysis (LRFD-9) in LEAP Concrete.

Below is the snapshot, I waited for almost an hour but the analysis was still going : 

Kindly let me know your suggestions. I have also attached the file.

Thanks,

Jivesh Kumar

Bridge Design Engineer