LEAP Bridge Concrete Substructure Auto-Design

Hi, Dear All,

Please see the following picture.

Questions:

1. Is it possible for us to look into the footing design calculation details in LEAP bridge substructure?

2. The required bar area is constant through the footing for both X & Z directions. Even at the edge of the footing?

3. How the required bar area is calculated for the crush wall?

Please advise.

Thanks,

Dong