LEAP Bridge Enterprise

LEAP Bridge V8i (SELECTseries 6) Version 13.00.00.23

Within the Geometry tab I have modeled a two unit bridge, the first unit having three spans and the second unit having four spans.  Is it possible to model the support located between the two units as a pier opposed to two abutments?

I've had to choose the Prestressed Girder option even though I am designing the substructure for Steel Plate Curved Girders.  Why is steel not an option?  Is it solely because Bentley doesn't have a package that designs steel girders?