• LEAP Bridge - Precast/Prestressed Girder - 10th points

    Hello, Camber and deflections are reported at 10th points along the beam. I am modelling a longer span which will require more than 10 screed points. Is there a way to toggle the number of points? Or do I have to interpolate? Thanks,
  • Conspan 10th points

    From what I understand Conspan calculates 10th point increments from the total precast length and not the bearing to bearing span length. Is there a way to get camber and deflection readouts at the bearing to bearing 10th points? All the DOTs in New England…