• Auto Load Generation: LL & BR in LEAP Bridge Concrete Substructure

    Hi, Dear All, Please advise that how the "number of lanes loaded" is determined? In the "superstructure parameters", I entered 7 as "number of lanes". But here only up to 6 I can select. Thanks, Dong