• Recalc Window 2. Extended Settings: 2. Pre-stressing

    The Recalc Window 2. Extended Settings: 2. Pre-stressing allows the users to set additional definitions for the calculations related to the stressing of tendons: Update CS Values: (-) duct areas : The area of the ducts is excluded in a new cross-section…
  • 25. Concrete Structures - External Prestressing

    In this Demo example a simple-supported beam with three different prestressing is considered for comparison: Variant 1 - PExt: External Tendons Only Variant 2 - DEFAULT: External and Internal Tendon Variant 3 - PInt: Internal Tendons Only …
  • Tendon Activation: Stress Action for a group of Stress Labels

    For RM Bridge inside OpenBridge Designer at Analyzer Analyzer /Schedule/Stages/Schedule Actions: user will find the Action to activate the cable in the right construction schedule, this will calculate internal primary forces of tendons by stepwise applying…
  • Tendon Load

    The Tendon load definitions are a series of prestressing cable stressing actions at their ends. For each side, the PT cables (Tendons) can be: PRE: prestressed, stressing; REL : releasing ; SWED/DEVL: length of wedge or development slip: These…
  • Stress loss in Tendon

    Hi everyone, I am looking for the value of stresses loss in tendon (lost due to relaxation of prestressing steel, lost due to relaxation of prestressing steel,.....), Can someone tell me where is it? I'm using rm bridge v11, Pictures below are the…