Document Type: FAQ Product(s): LEAP RCPIER/Substructure Version(s): All Original Author: Bentley Technical Support Group - VM
Document Type: FAQ
Product(s): LEAP RCPIER/Substructure
Version(s): All
Original Author: Bentley Technical Support Group - VM
ANSWER:
In the current version of RC pier It is not possible to assign Drill Shaft under a spread footing or Grade Beam.
Drill shaft needs to be assigned directly below column.