You are currently reviewing an older revision of this page.
Document Type: FAQ Product(s): LEAP RCPIER Version(s): All Original Author: Bentley Technical Support Group - VM
Document Type: FAQ
Product(s): LEAP RCPIER
Version(s): All
Original Author: Bentley Technical Support Group - VM
ANSWER:
In the current version of RCpier It is not possible to assign Drill Shaft under a spread footing or Grade Beam.
Drill shaft needs to be assigned directly below column.