Schedule Actions


In RM Bridge Analyzer at Schedule \ Stages \ Schedule Actions user defines the time frame for all stage performed calculations. The possible Action input options could be as in the list and as shown in the picture below:

  1. Static Calculation: available usual static structural analysis;
  2. Dynamic Calculation: available advanced dynamic structural analysis;
  3. LC Check actions: schedule actions performing proof checks for individual load cases, either directly calculated or generated;
  4. Sup Check actions: schedule actions performing proof checks for superposition files;
  5. LC/Envelope actions: available Load Case and Envelope manipulations;
  6. List/plot actions: result-list and plot actions;
  7. Systems commands: available Copy, Show, Delete, Rename, etc...;
  8. Structure change commands: available Change of Start or End Nodes, Activation or Deactivation, and Cross-section properties modifications of Elements.