PSC Bridge Design with OBM / RM in Standalone workflow
In the following example a three-span concrete hollow box girder shown in the picture below will be defined. The bridge is built in three construction stages.
The 140m long three-span bridge (40m + 60m + 40m) is located on a circular curve. The cross-section of the main girder is hollow box and varies along the station. The super structure consists of two 20m tall piers and two abutments.
Procedure and main features for PSC Bridge Design:
Contents List:
Video 3: RM Bridge – Reinforcements Definition.
Video 4: RM Bridge - Analysis and Bridge Design.