In RM Bridge Enterprise > Analyzer, were defined the several Construction Stages considered in the bridge built and until the composite is activate (before concrete slab is hardened). Presented below the different construction stages calculated.
STG01 – Infrastructure
STG02 – Steel Beams
STG03 – Stiffeners
STG04 – Cross Frames
STG05 – Abutment Diaphragms
STG06 – Wet Concrete
In the next video is presented how to introduce load cases, consider the creep and shrinkage effects, define construction stages and schedule actions, and how to look at results in the Main View.
Integral Steel Composite Bridge – video2