In this video is presenting the Last Construction Stage after the concrete slab is hardened and composite elements activated.
It is introduced the load cases for deck wearing surface and utilities, the earth pressure behind abutments, the transferring of reactions to the definitive supports (rigid connection with abutments) and creep and shrinkage till the end of construction and until 10 000 days, for long term effects.
LC07 – transfer of reactions SDL- Superimposed dead loads
EP – earth pressure CS-INF – creep and shrinkage
After running, the User can look at results in shells and integrated forces in beams, too.
SDL- Superimposed dead loads
EP – earth pressure
CS-INF – creep and shrinkage
In the next video is presented how to create the last construction stage in RM Analyzer.