It was installed post-tensioned tendons on the cantilevers over the piers - Segments 2 and 4.
Considered the pre-tensioned tendons installed on the End and Mid Segments of Precast Beams.
And the continuous post-tensioned tendons placed after casting closure pours and having the structural continuous system working.