To have the fitting and piping accessory look exactly like the Open Plant Modeler,how can I start and plan the cell creation to have the connection points in between piping and the piping components?
The piping tools in OpenBuildings are aimed at internal building pipework so do not replicate the functionality of OpenPlant.
We have a number of component catalogues available to our datasets, you may find what you need by reviewing those?
Marc
After trying, the size and specification can be adjusted based on the default piping accesories. However, the appearance of default piping acceseries are different from what I want to show.
Is creating parametric cell another solution to have what I want to show?
Hi Agnes,
If you're referring to how the components are displayed in a drawing, you can use the Plan Symbol override option via Mechanical drawing rules to select an alternate cell for specific components: https://docs.bentley.com/LiveContent/web/OpenBuildings%20Designer%20Help-v3/en/BmechEditDrawingRule.html