Placing a Flex Duct in a Top View snaps down 100 ft. when connecting to a Rigid Duct All other views work.
Copy View from one of the working views to View 1 (Top) and rotate it back to a Top View.
Place the Flex Duct in the Top view and now it connects to the Rigid Duct. Some view setting (Camera, Perspective, etc.) had been inadvertently set which was corrected from the copied view.
Place the Flex Duct in the Top view and now it connects to the Rigid Duct.
Some view setting (Camera, Perspective, etc.) had been inadvertently set which was corrected from the copied view.