You are currently reviewing an older revision of this page.
Are there any modelling workflow that can help to decrease Simulation time while handling very large models with high passengers attendance?
Here, are some modelling tips to help improve simulation speed.Large areas with lots of demand and congestion will inevitably run more slowly than smaller, simpler spaces. However, there are a number of things you can do to try and help the situation:
Following these, where possible, will reduce simulation times, but don’t expect them to halve. A good model built following these guidelines may run 10-20% faster, at best.