OpenBuildings | AECOsim | Speedikon Wiki Migration - Upgrading from earlier versions
    • Sign in
    • Building Design - Wiki
    • -OpenBuildings Designer
      • +What's New
      • FAQ - OpenBuildings Designer CONNECT Edition
      • Released Versions - OpenBuildings Designer
      • IFC4 Self-certification
      • +Installation - OpenBuildings Designer
      • -Migration - Upgrading from earlier versions
        • Migrating custom content from AECOsim Building Designer SS6 to a current OpenBuildings Designer version
      • +Configuration - OpenBuildings Designer
      • +General - OpenBuildings Designer
      • +User Interface - OpenBuildings Designer
      • +Architectural Design - OpenBuildings Designer
      • +Structural Design - OpenBuildings Designer
      • +ProStructures Interoperability - OpenBuildings Designer
      • +Electrical Annotation and Design - OpenBuildings Designer
      • +Datasets and Content - OpenBuildings Designer
      • +DataGroup System - OpenBuildings Designer
      • +Floor Management - OpenBuildings Designer
      • +Grid Systems - OpenBuildings Designer
      • +Drawing Views - OpenBuildings Designer
      • +Annotation - OpenBuildings Designer
      • +Import/Export- OpenBuildings Designer
      • +ProjectWise Integration - OpenBuildings Designer
      • +Customization - OpenBuildings
      • +Platform Tools - OpenBuildings Designer
      • +Plumbing Design
      • Electrical Designer
      • +Learning Tips
      • +HVAC Design - OpenBuildings Designer
      • +OpenBuildings Designer Accreditation Program
    • +OpenBuildings Energy Simulator
    • +GenerativeComponents
    • OpenBuildings Station Designer
    • +OpenBuildings Speedikon + Bentley Speedikon V8i
    • +Bentley Facilities Space Planner CONNECT Edition
    • +AECOsim Building Designer
    • +iModel Plugin for Revit
    • +Social Distance Assessments
    • Working from home with OpenBuildings products
    • Working from home with Speedikon
    • +Special Interest Group (SIG) FAQs
    • +Structural Modeler_PS
    • +Configuration Explorer
    • +Legacy Products

     
     Questions about this article, topic, or product? Click here. 

    Migration - Upgrading from earlier versions

      Product(s): OpenBuildings Designer
      Version(s): CONNECT Edition
      Environment: N/A
      Area: Installation
      Subarea: Migration/Upgrade

    Overview

    Migration of datasets and projects to a newer version of AECOsim Building Designer can be accomplished by following the guides in this section. Application installation is covered in the Installation - OpenBuildings Designer section.

    This is a task that generally should only be undertaken by the people responsible for maintenance of the CAD/BIM systems to ensure that the appropriate company procedures are followed and the required IT security permissions are available.

    The best approach is to create a duplicate workspace containing the Dataset and other resources for the new version and a separate location for new and upgraded projects. Projects to be upgraded should be copied to the new location leaving the existing version intact until the migration has been successfully completed.

    It is frequently advised that active projects should not be upgraded to a new application version (on most CAD/BIM platforms). This is good advice as any significant changes in the IT aspects of a project generally carry some element of risk. However depending on the size of a project, the stage a project has reached and/or on the project duration, version migration may be worth considering if the updates provided by the latest application version offer sufficient productivity or other advantages to justify the time spent on upgrade.

    • Projects close to completion will usually not be worth upgrading, the gains are likely to be minimal.
    • Those at an early stage are prime candidates, the gains are likely to be significant and the task and associated disruption will be smaller.
    • Projects in mid-stream will need careful consideration of the factors involved.

    • CONNECT Edition
    • upgrade
    • Dataset and Content
    • OpenBuildings Designer
    • Migration
    • Installallation
    • Share
    • History
    • More
    • Cancel
    • Marc Thomas Created by Bentley Colleague Marc Thomas
    • When: Fri, Oct 1 2021 4:53 AM
    • Molly Brown Last revision by Bentley Colleague Molly Brown
    • When: Wed, Feb 16 2022 7:37 AM
    • Revisions: 3
    • Comments: 0
    Recommended
    Related
    Communities
    • Home
    • Getting Started
    • Community Central
    • Products
    • Support
    • Secure File Upload
    • Feedback
    Support and Services
    • Home
    • Product Support
    • Downloads
    • Subscription Services Portal
    Training and Learning
    • Home
    • About Bentley Institute
    • My Learning History
    • Reference Books
    Social Media
    •    LinkedIn
    •    Facebook
    •    Twitter
    •    YouTube
    •    RSS Feed
    •    Email

    © 2021 Bentley Systems, Incorporated  |  Contact Us  |  Privacy |  Terms of Use  |  Cookies