Could you please clarify how the peak coincident load is determined in Design Database CIBSE gains programme.
Thank You
Hi Christopher,
The peak coincident load is listed on the final page of the CIBSE Gain reports, along with all the related air flow requirements:
Further guidance on this can be found in the manual (accessed as detailed here) as below:
Shane Regan | Principle Building Performance Support EngineerHevacomp to OpenBuildings - A complete guide for every user | Bentley Communities
Answer Verified By: Christopher Spencer