<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="https://communities.bentley.com/cfs-file/__key/system/syndication/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Running low level pipe work and changing it to high level on the same floor??</title><link>https://communities.bentley.com/products/building/performance/f/hevacomp-forum/201784/running-low-level-pipe-work-and-changing-it-to-high-level-on-the-same-floor</link><description>Is it possible to run low level pipe work and then have it rise up to high level (ceiling Void)???. For context , the pipe work is serving the building at low level and when it entres the building it rises up to high level within the ceiling void. Is</description><dc:language>en-US</dc:language><generator>Telligent Community 12</generator><item><title>RE: Running low level pipe work and changing it to high level on the same floor??</title><link>https://communities.bentley.com/thread/603959?ContentTypeID=1</link><pubDate>Fri, 14 Aug 2020 09:16:18 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:ca55de9b-e209-4954-8841-64dc22779846</guid><dc:creator>Shane Regan</dc:creator><description>&lt;p&gt;No problem at all Seamus, glad that helped.&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Running low level pipe work and changing it to high level on the same floor??</title><link>https://communities.bentley.com/thread/603958?ContentTypeID=1</link><pubDate>Fri, 14 Aug 2020 09:13:55 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:1e7cd43e-86ca-4f2f-8e86-32e6c8a39099</guid><dc:creator>seamus murphy</dc:creator><description>&lt;p&gt;Hi Shane , thank you for your response. Thats great cheers for the help , I wasnt to sure if I was to go about it in the same way as adding in a floor connector.&amp;nbsp;&lt;/p&gt;
&lt;p&gt;Kind Regards&lt;/p&gt;
&lt;p&gt;&lt;/p&gt;
&lt;p&gt;Seamus&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item><item><title>RE: Running low level pipe work and changing it to high level on the same floor??</title><link>https://communities.bentley.com/thread/603954?ContentTypeID=1</link><pubDate>Fri, 14 Aug 2020 08:53:43 GMT</pubDate><guid isPermaLink="false">6dad98f5-dbc9-4c4d-a9ba-e9da8dc6aa8e:1b56a38b-cb54-47ee-ba73-22011f496645</guid><dc:creator>Shane Regan</dc:creator><description>&lt;p&gt;Hi Seamus,&lt;/p&gt;
&lt;p&gt;Yes you can indeed - you just need to&amp;nbsp;trace your LL pipe, change the default pipe height to HL, and then click on the same end&amp;nbsp;point of the LL pipe, where you wish to place&amp;nbsp;the riser.&lt;/p&gt;
&lt;p&gt;The first half of &lt;a href="/products/building/performance/w/building_performance__wiki/5092/how-to-add-floor-change-connectors"&gt;this article&lt;/a&gt; details how to do this.&lt;/p&gt;&lt;div style="clear:both;"&gt;&lt;/div&gt;</description></item></channel></rss>