Is it possible to run low level pipe work and then have it rise up to high level (ceiling Void)???. For context , the pipe work is serving the building at low level and when it entres the building it rises up to high level within the ceiling void. Is the a way to do this or do you have to draw the full pipe network at one constant level, IE low level or at high level?????
When I draw the pipe work at low level and then change it to ceiling level when it entres the building , the pipe work looks like it is at an angle or slopping up instead of having a nice 90 degree upward transiton from ll to hl.
Any help on this matter is greatly appreciated.
Kind Regards
Seamus Murphy